Introduction & Importance of Asphalt Calculator Formula

Understanding the precise calculation of asphalt requirements is fundamental to successful paving projects

The asphalt calculator formula represents a critical intersection between civil engineering precision and practical construction execution. This mathematical framework enables contractors, engineers, and project managers to determine with exceptional accuracy the exact quantity of asphalt required for any paving project, from residential driveways to municipal roadways.

At its core, the asphalt calculation process converts three-dimensional project specifications (length × width × depth) into actionable material quantities measured in tons. This conversion accounts for material density variations, project-specific waste factors, and real-world application conditions that can significantly impact material requirements.

Engineering team reviewing asphalt calculator formula blueprints with digital tablet showing material calculations

Why Precision Matters in Asphalt Calculations

  1. Cost Control: Asphalt represents 60-75% of total paving project costs. Accurate calculations prevent both material shortages (which cause delays) and over-ordering (which wastes budget).
  2. Project Scheduling: Material delivery schedules depend on precise quantity estimates. Underestimation can halt construction for days waiting for additional material.
  3. Quality Assurance: Proper material quantities ensure consistent pavement thickness, which directly impacts durability and lifespan.
  4. Environmental Responsibility: Over-ordering leads to material waste, while under-ordering may require emergency deliveries with higher carbon footprints.
  5. Contractual Compliance: Many municipal contracts specify exact material quantities with penalties for variances exceeding 5-10%.

Industry studies show that projects using precise calculation methods experience 22% fewer cost overruns and 31% fewer schedule delays compared to those using estimates. The National Asphalt Pavement Association (NAPA) reports that proper material calculation can reduce project costs by 8-12% through optimized material usage.

How to Use This Asphalt Calculator

Step-by-step guide to obtaining accurate asphalt quantity estimates

Step 1: Measure Your Project Area

Begin by determining the total square footage of your paving area. For rectangular areas, multiply length by width. For irregular shapes:

  • Divide the area into measurable sections (rectangles, triangles, circles)
  • Calculate each section separately using appropriate geometric formulas
  • Sum all section areas for total square footage
  • Use surveyor tools or digital measuring apps for complex shapes

Pro Tip: For existing surfaces being overlaid, measure the actual paved area rather than property dimensions, as setbacks and landscaping often reduce paving area by 5-15%.

Step 2: Determine Asphalt Thickness

Standard asphalt thickness varies by application:

  • Residential Driveways: 2-3 inches for new construction, 1.5-2 inches for overlays
  • Commercial Parking Lots: 3-4 inches for new, 2-3 inches for overlays
  • Municipal Roads: 4-6 inches for arterial roads, 2-3 inches for residential streets
  • Heavy-Duty Applications: 6-8 inches for truck terminals or industrial yards

Always verify local building codes, as many municipalities specify minimum thickness requirements. The Federal Highway Administration provides national standards for roadway thickness.

Step 3: Select Material Density

Asphalt density varies based on:

  • Mix design (hot mix, warm mix, cold mix)
  • Aggregate type and gradation
  • Asphalt binder content
  • Compaction level achieved

Our calculator provides standard density options:

  • 140 lbs/ft³: Light-density mixes (often used for patching)
  • 145 lbs/ft³: Standard hot mix (most common for general paving)
  • 150 lbs/ft³: Heavy-density mixes (highways, heavy traffic areas)
  • 155 lbs/ft³: Super heavy mixes (airport runways, industrial)

Step 4: Account for Waste Factor

Waste factors account for:

  • Material loss during transport and handling
  • Uneven subgrade requiring additional material
  • Cutting and shaping requirements
  • Compaction variations

Standard waste factors by project type:

Project Type Recommended Waste Factor Typical Material Loss
Simple rectangular areas 5% 3-7%
Standard driveways/parking lots 10% 8-12%
Complex shapes with curves 15% 12-18%
Municipal road projects 12% 10-14%
Industrial/heavy-duty paving 20% 15-25%

Step 5: Review and Apply Results

After calculation, you’ll receive:

  • Total Asphalt Needed (tons): Primary ordering quantity
  • Volume Required (cubic yards): Useful for comparing with supplier quotes
  • Estimated Cost: Based on national average pricing ($80-$120/ton)
  • Waste Allowance: Breakdown of additional material for contingencies

Verification Tip: Cross-check results using the manual formula:

(Area × Thickness × Density) ÷ 2000 × (1 + Waste Factor) = Tons Required

Advanced Usage Tips

  • For multi-layer projects, calculate each layer separately and sum the results
  • Adjust density for warm mix asphalt (typically 2-3% less than hot mix)
  • For overlays, subtract existing pavement thickness from total desired thickness
  • Use the chart visualization to explain requirements to clients or team members
  • Save calculations as PDF for project documentation and material ordering

Asphalt Calculator Formula & Methodology

The mathematical foundation behind precise asphalt quantity calculation

The asphalt calculator employs a multi-stage computational process that converts project dimensions into actionable material quantities. This methodology follows industry-standard practices established by the American Association of State Highway and Transportation Officials (AASHTO) and the Asphalt Institute.

Core Calculation Formula

The fundamental formula converts cubic measurements to weight:

Tons = (Area × Depth × Density) ÷ 2000 × (1 + Waste Factor)

Variable Definitions:

  • Area (sq ft): Total surface area to be paved
  • Depth (inches): Desired asphalt thickness (converted to feet in calculation)
  • Density (lbs/ft³): Material-specific weight per cubic foot
  • 2000: Conversion factor from pounds to tons
  • Waste Factor: Percentage added for material loss (expressed as decimal)

Step-by-Step Computational Process

  1. Unit Conversion: Convert all measurements to consistent units (inches to feet)
  2. Volume Calculation: Compute cubic footage (Area × Depth)
  3. Weight Conversion: Multiply volume by density to get pounds
  4. Ton Conversion: Divide pounds by 2000 for tons
  5. Waste Adjustment: Multiply by (1 + waste factor)
  6. Rounding: Apply practical rounding (nearest 0.1 ton for orders under 10 tons, nearest whole ton for larger orders)

Density Variations by Mix Type

Asphalt Mix Type Typical Density (lbs/ft³) Common Applications Compaction Requirements
Hot Mix Asphalt (HMA) 142-148 Highways, parking lots, driveways 92-96% of theoretical maximum density
Warm Mix Asphalt (WMA) 138-145 Environmentally sensitive areas, urban projects 90-94% of theoretical maximum density
Cold Mix Asphalt 130-140 Patching, temporary repairs 85-90% of theoretical maximum density
Stone Matrix Asphalt (SMA) 150-158 High-stress areas, heavy traffic 94-98% of theoretical maximum density
Porous Asphalt 110-125 Parking lots, stormwater management 80-85% of theoretical maximum density

Compaction Factor Considerations

The calculator assumes standard compaction levels. Actual field conditions may require adjustments:

  • Poor Subgrade: May require 5-10% additional material for proper compaction
  • High Ambient Temperatures: Can reduce required material by 2-4% due to easier compaction
  • Mechanical Compaction: Vibrating rollers achieve 3-5% better density than static rollers
  • Layer Thickness: Thinner lifts (under 2″) may require 8-12% more material for equivalent strength

For projects requiring precise compaction control, consider using nuclear density gauges or non-nuclear alternatives to verify in-place density matches design specifications.

Real-World Asphalt Calculator Examples

Practical applications demonstrating the calculator’s versatility

Example 1: Residential Driveway Replacement

Project Details: 24′ × 30′ driveway, 3″ thick hot mix asphalt, 10% waste factor

Calculation:

  • Area = 24 × 30 = 720 sq ft
  • Depth = 3″ = 0.25 ft
  • Volume = 720 × 0.25 = 180 cubic feet
  • Weight = 180 × 145 = 26,100 lbs
  • Tons = 26,100 ÷ 2000 = 13.05
  • With waste = 13.05 × 1.10 = 14.36 tons

Result: Order 14.5 tons (standard rounding)

Cost Estimate: $1,305-$1,950 at $90-$135/ton

Completed residential driveway showing proper asphalt thickness and smooth finish achieved through precise calculation

Example 2: Commercial Parking Lot Expansion

Project Details: 150′ × 200′ addition, 4″ thick heavy-duty mix, 12% waste factor

Calculation:

  • Area = 150 × 200 = 30,000 sq ft
  • Depth = 4″ = 0.333 ft
  • Volume = 30,000 × 0.333 = 9,990 cubic feet
  • Weight = 9,990 × 150 = 1,498,500 lbs
  • Tons = 1,498,500 ÷ 2000 = 749.25
  • With waste = 749.25 × 1.12 = 839.16 tons

Result: Order 840 tons

Cost Estimate: $67,200-$100,800 at $80-$120/ton

Implementation Notes: Project divided into 5 phases with separate calculations for each to account for varying thickness at entrance/exit points.

Example 3: Municipal Road Resurfacing

Project Details: 2-mile road (40′ wide), 2″ overlay, standard hot mix, 15% waste factor

Calculation:

  • Length = 2 miles = 10,560 ft
  • Area = 10,560 × 40 = 422,400 sq ft
  • Depth = 2″ = 0.1667 ft
  • Volume = 422,400 × 0.1667 = 70,411 cubic feet
  • Weight = 70,411 × 145 = 10,209,595 lbs
  • Tons = 10,209,595 ÷ 2000 = 5,104.80
  • With waste = 5,104.80 × 1.15 = 5,870.52 tons

Result: Order 5,875 tons

Cost Estimate: $470,000-$704,000 at $80-$120/ton

Logistical Considerations: Required 120 truckloads (50 tons each) delivered over 6 days with police escort for urban sections.

Common Calculation Mistakes to Avoid

  1. Unit Confusion: Mixing inches and feet in depth measurements (always convert to feet)
  2. Area Miscalculation: Forgetting to subtract existing structures or non-paved areas
  3. Density Assumptions: Using default density for specialty mixes (always verify with supplier)
  4. Waste Underestimation: Complex urban projects often require 15-20% waste factors
  5. Layer Omission: For multi-layer projects, calculating only the surface course
  6. Compaction Ignorance: Not accounting for material volume reduction during compaction
  7. Supplier Variance: Assuming all suppliers use identical mix designs and densities

Asphalt Industry Data & Statistics

Critical benchmarks and comparative analysis for informed decision-making

National Asphalt Production and Usage Statistics

Category 2020 Data 2023 Data Change Source
Total Asphalt Production (million tons) 385.4 412.7 +7.1% NAPA/USGS
Recycled Asphalt (million tons) 82.2 98.6 +20.0% FHWA
Average Price per Ton $78.50 $92.30 +17.6% USGS
Warm Mix Usage (%) 28.4% 35.1% +23.6% NAPA
Porous Asphalt Projects 1,245 1,872 +50.4% Asphalt Institute
Average Project Waste (%) 12.3% 10.8% -12.2% ARTBA

Regional Asphalt Cost Comparison (2024)

Region Base Price ($/ton) Delivery Cost ($/ton) Total Cost ($/ton) Annual Price Change
Northeast 95-110 12-18 107-128 +6.2%
Southeast 80-95 8-14 88-109 +4.8%
Midwest 85-100 10-16 95-116 +5.5%
Southwest 90-105 15-22 105-127 +7.1%
West 100-120 18-25 118-145 +8.3%

Asphalt Lifespan by Application and Maintenance

Proper material calculation directly impacts pavement longevity:

Application Type Standard Thickness Expected Lifespan (Years) With Proper Maintenance Maintenance Cost (% of Replacement)
Residential Driveway 2-3″ 12-15 20-25 15-20%
Commercial Parking Lot 3-4″ 15-18 25-30 20-25%
Municipal Road 4-6″ 20-25 35-40 10-15%
Highway Surface Course 1.5-2.5″ 10-12 15-18 25-30%
Industrial Yard 6-8″ 25-30 40+ 8-12%

Emerging Trends in Asphalt Technology

  • High-Reclaimed Asphalt Pavement (RAP) Mixes: Now containing up to 50% recycled material without performance loss, reducing material costs by 12-18%
  • Bio-Based Binders: Plant-derived binders replacing 20-30% of petroleum bitumen, improving sustainability metrics
  • Self-Healing Asphalt: Microcapsule technology extending pavement life by 30-40% through automatic crack repair
  • Cool Pavement Technologies: Reflective coatings reducing urban heat island effect by 5-8°F
  • 3D-Paved Surfaces: Precision paving techniques reducing material usage by 8-12% through optimized thickness
  • AI-Optimized Mix Design: Machine learning algorithms creating custom mixes with 15-20% better performance-to-cost ratios

For the most current industry data, consult the Asphalt Institute’s annual reports and the FHWA Pavement Materials Program.

Expert Tips for Asphalt Project Success

Professional insights to maximize value and performance

Pre-Construction Phase

  1. Subgrade Preparation:
    • Conduct soil testing to determine bearing capacity
    • Address any soft spots with undercutting and replacement
    • Ensure proper drainage (minimum 2% slope for water runoff)
    • Consider geotextile fabric for weak subgrades
  2. Material Selection:
    • Match mix design to traffic loads and climate conditions
    • For cold climates, specify PG 58-28 or 64-28 binders
    • In hot climates, use PG 70-22 or 76-22 for rut resistance
    • Consider polymer-modified asphalt for high-stress areas
  3. Supplier Coordination:
    • Verify plant location relative to project site
    • Confirm mix production capacity (tons/hour)
    • Establish delivery windows and truck cycle times
    • Request test strips to verify mix workability

Construction Phase

  1. Paving Operations:
    • Maintain consistent paver speed (15-30 ft/min)
    • Monitor mat temperature (275-325°F for HMA)
    • Use automatic screed controls for uniform thickness
    • Implement quality control testing every 500 tons
  2. Compaction:
    • Begin rolling immediately behind paver (before temperature drops below 250°F)
    • Use breakdown, intermediate, and finish rolling patterns
    • Aim for 92-96% of theoretical maximum density
    • Adjust roller patterns for edges and tight areas
  3. Joint Construction:
    • Use proper joint preparation techniques
    • Maintain 1.5-2″ overlap for longitudinal joints
    • Apply joint sealant at 300-350°F
    • Consider joint matching for phased projects

Post-Construction Phase

  1. Quality Assurance Testing:
    • Conduct core samples to verify thickness
    • Perform density testing (nuclear or non-nuclear)
    • Check smoothness with profilometer (IRI < 95 for highways)
    • Document all test results for warranty purposes
  2. Traffic Management:
    • Keep new pavement closed to traffic until cooled below 150°F
    • Implement temporary speed reductions for first 30 days
    • Restrict heavy vehicle turning for initial 7 days
    • Monitor for early-life distresses

Maintenance Optimization

  1. Preventive Maintenance:
    • Apply fog seal within first year
    • Conduct crack sealing annually
    • Implement chip sealing every 3-5 years
    • Monitor drainage systems semi-annually
  2. Corrective Actions:
    • Address raveling with sand seal coats
    • Repair potholes with proper patching techniques
    • Mill and overlay for widespread distress
    • Consider full-depth reclamation for structural failures
  3. Performance Monitoring:
    • Conduct annual pavement condition surveys
    • Track ride quality metrics (IRI)
    • Monitor skid resistance values
    • Document all maintenance activities

Cost-Saving Strategies

  • Material Optimization:
    • Use thinner lifts with proper compaction (can reduce material by 10-15%)
    • Incorporate RAP materials (saves $3-$8/ton)
    • Consider warm mix asphalt (reduces fuel costs by 20-30%)
    • Time purchases for off-peak seasons (winter discounts of 5-10%)
  • Construction Efficiency:
    • Schedule paving during optimal temperature windows
    • Minimize truck waiting time at paver
    • Use material transfer vehicles for continuous paving
    • Implement e-ticketing for real-time material tracking
  • Long-Term Value:
    • Invest in higher-quality mixes for reduced life-cycle costs
    • Implement preventive maintenance programs
    • Use performance-based specifications
    • Consider life-cycle cost analysis for material selection

Interactive Asphalt Calculator FAQ

Expert answers to common questions about asphalt calculation and application

How does temperature affect asphalt density and my calculation?

Temperature significantly impacts asphalt density through several mechanisms:

  • Mix Temperature: Hot mix asphalt (HMA) is typically produced at 300-350°F. As it cools during transport and placement, its density increases. Our calculator uses standard densities measured at placement temperatures (275-300°F).
  • Compaction Window: Asphalt must be compacted while above 250°F for optimal density. Cooler temperatures require more compaction effort and may result in 2-5% lower achieved density.
  • Ambient Conditions: Cold weather (below 50°F) can cause rapid cooling, potentially reducing in-place density by 3-7%. Warm weather may allow slightly better compaction.
  • Seasonal Adjustments: For winter paving, consider increasing your order by 3-5% to account for potential density variations.

For precise temperature-adjusted calculations, consult your material supplier for temperature-density curves specific to your mix design.

Can I use this calculator for asphalt overlays, and what adjustments are needed?

Yes, this calculator works excellent for overlay projects with these adjustments:

  1. Thickness Measurement: Enter only the new asphalt layer thickness (not total pavement thickness). For example, a 2″ overlay on existing 4″ pavement uses 2″ in the calculator.
  2. Surface Preparation: Account for milling if applicable:
    • If milling 1.5″ before 2″ overlay, net addition is 0.5″
    • Adjust your thickness input accordingly
  3. Bonding Considerations:
    • For thin overlays (<1.5"), consider using a tack coat (add 0.05-0.10 gal/sy to material cost)
    • Thicker overlays (>2″) may require mill-and-fill approach
  4. Existing Condition:
    • Severely cracked surfaces may require 10-15% additional material for proper coverage
    • Adjust waste factor upward for poor existing conditions
  5. Traffic Considerations:
    • High-traffic areas may benefit from 25% heavier mix density
    • Consider polymer-modified binders for overlays on busy roads

Pro Tip: For overlay projects, conduct a test section to verify the actual yield of your specific mix on the existing surface.

What’s the difference between hot mix, warm mix, and cold mix asphalt in calculations?

The primary differences affect both the calculation inputs and real-world performance:

Characteristic Hot Mix Asphalt (HMA) Warm Mix Asphalt (WMA) Cold Mix Asphalt
Production Temperature 300-350°F 200-250°F Ambient
Calculator Density (lbs/ft³) 142-148 138-145 130-140
Compaction Temperature 250-300°F 220-270°F 50-150°F
Waste Factor Adjustment Standard (10-15%) +2-3% (lower density) +10-15% (higher variability)
Thickness Adjustment None None +20-25% (lower density)
Best Applications All permanent paving Urban areas, cool weather Temporary patches, remote areas

Calculation Adjustments:

  • For WMA, select the next lower density option in the calculator
  • For cold mix, manually reduce the calculated tonnage by 8-12% due to lower in-place density
  • Consider adding 5-10% to the waste factor for cold mix applications

WMA typically costs $2-$5 more per ton but can reduce fuel consumption by 20-35% during production and paving.

How do I account for different asphalt layers in my calculation?

For multi-layer asphalt projects, use this systematic approach:

  1. Identify Layers: Typical pavement structures include:
    • Base Course (3-6″ thick, larger aggregate)
    • Intermediate Course (2-4″ thick, medium aggregate)
    • Surface Course (1-2″ thick, fine aggregate)
  2. Calculate Each Layer Separately:
    • Use this calculator for each layer with appropriate thickness
    • Select density specific to each mix type (base courses are typically 2-5% heavier)
    • Apply layer-specific waste factors (base courses often have higher waste)
  3. Sum the Results:
    • Add the tonnage from all layers for total material
    • Consider phasing deliveries to match construction sequence
  4. Special Considerations:
    • Tack coats between layers add 0.02-0.05 gal/sy (include in cost estimates)
    • Layer bonding may reduce interface waste by 2-3%
    • Thinner surface courses may require 5-10% more material for proper coverage

Example Multi-Layer Calculation:

For a 10,000 sq ft parking lot with:

  • 4″ base course (150 lbs/ft³, 12% waste) = 375 tons
  • 2″ intermediate course (148 lbs/ft³, 10% waste) = 185 tons
  • 1.5″ surface course (145 lbs/ft³, 8% waste) = 114 tons
  • Total: 674 tons

Pro Tip: Coordinate with your paving contractor to optimize layer thicknesses based on traffic loads and subgrade conditions.

What are the most common mistakes in asphalt calculations and how can I avoid them?

Based on industry studies and contractor surveys, these are the top calculation errors and prevention strategies:

Common Mistake Impact Prevention Strategy Calculation Adjustment
Incorrect area measurement ±10-20% material variance Use laser measuring tools, verify with multiple methods Remeasure and recalculate
Wrong density selection ±5-15% tonnage error Obtain mix design sheets from supplier, confirm with lab tests Use supplier-provided density
Ignoring waste factors Material shortages, project delays Use our calculator’s waste options, add 2-3% for complex projects Increase waste factor by 5%
Unit confusion (inches vs feet) 400% thickness errors Double-check all unit conversions, use consistent units Convert inches to feet (÷12)
Not accounting for compaction 10-20% material overage Specify target density in contract, test during paving Add 5% for compaction loss
Forgetting tack coats Adhesion failures, reduced lifespan Include in material takeoffs, specify in contract Add 0.03 gal/sy to costs
Overlooking phasing needs Material spoilage, scheduling conflicts Plan delivery sequences, coordinate with plant Calculate phases separately

Verification Checklist:

  1. Have two team members independently verify all measurements
  2. Confirm mix design densities with supplier documentation
  3. Add 5% contingency for unexpected conditions
  4. Conduct pre-paving meeting to review calculations
  5. Document all assumptions and adjustments

The National Center for Asphalt Technology reports that projects using formal calculation verification processes experience 62% fewer material-related issues.

How does asphalt recycling affect my material calculations?

Recycled asphalt pavement (RAP) significantly impacts calculations through several factors:

Material Property Adjustments:

  • Density Variations: RAP-containing mixes typically have 1-3% higher density (148-152 lbs/ft³ for 30% RAP)
  • Absorption Rates: RAP mixes may require 2-5% more binder, slightly increasing weight
  • Gradation Changes: Higher RAP content can affect workability, potentially increasing waste factors by 1-2%

Calculation Modifications:

  1. For mixes with 15-25% RAP:
    • Increase density by 1% in calculator (e.g., 146 → 147 lbs/ft³)
    • No waste factor adjustment needed
  2. For mixes with 25-50% RAP:
    • Increase density by 2-3%
    • Add 1% to waste factor
    • Consider 5% additional material for compaction variability
  3. For high-RAP mixes (50%+):
    • Consult supplier for exact density values
    • Add 2-3% to waste factor
    • Plan for potential 10% material overage

Economic Considerations:

  • RAP mixes typically cost $3-$8 less per ton than virgin mixes
  • Potential LEED credits for recycled content (verify with USGBC)
  • Possible local government incentives for sustainable materials
  • Long-term performance equivalent to virgin mixes when properly designed

Calculation Example: For a 5,000 sq ft project with 4″ thickness using 40% RAP mix:

  • Standard calculation: 145 lbs/ft³ → 136.11 tons
  • RAP-adjusted: 148 lbs/ft³ (+2%) → 138.77 tons
  • With 12% waste: 155.42 tons (vs 152.44 standard)
  • Cost savings: ~$1,200 at $8/ton discount

Always request the RAP content percentage and adjusted density from your supplier for precise calculations.

How can I verify the accuracy of my asphalt calculation before ordering?

Implement this multi-step verification process to ensure calculation accuracy:

Mathematical Cross-Checks:

  1. Manual Calculation:

    Use the formula: (Area × Depth × Density) ÷ 2000 × (1 + Waste)

    Example: 10,000 sq ft × 0.25 ft × 145 ÷ 2000 × 1.10 = 199.69 tons

  2. Unit Verification:
    • Confirm all measurements use consistent units (feet for depth)
    • Verify density is in lbs/ft³ (not kg/m³ or other units)
  3. Alternative Method:

    Calculate volume in cubic yards first, then convert to tons:

    (Area × Depth) ÷ 27 × 2.025 × Density Factor × (1 + Waste)

Physical Verification Methods:

  • Test Strip: Pave a 10′ × 10′ section and measure actual yield
  • Material Weighing: Weigh sample batches to verify density
  • Supplier Confirmation: Provide calculations to supplier for review
  • Historical Data: Compare with similar past projects

Professional Validation:

  • Consult with a certified paving inspector
  • Engage a materials testing laboratory for mix verification
  • Review with project engineer or architect
  • Check against industry standards (AASHTO M 323)

Red Flag Indicators:

Investigate if your calculation shows:

  • More than 10% variation from similar past projects
  • Significantly different results from supplier’s estimate
  • Material quantities that seem too convenient (round numbers)
  • Waste factors outside typical ranges for your project type

Documentation Tip: Create a calculation verification sheet showing:

  • All input measurements with sources
  • Intermediate calculation steps
  • Assumptions made (density, waste, etc.)
  • Verification methods used
  • Final approved quantities

This documentation serves as valuable protection against disputes and helps identify patterns for future projects.